Wednesday, 4 June 2014

Sailing in the River Severn


Approaching the Second Severn Crossing.



Fully rigged; for what it was worth in the puff of wind!  Making 7.9 knots over the ground and only 1.5 through the water. Got to love going through the shoots! 





Approaching the original Severn Bridge. 


Waiting for the tide to turn to head back downstream.